Reports
---------------------------------------------------------------------------------------
 |
Pick the picture above to see the report from the Osprey meeting May 2010 |
 |
 |
Easter Day 2008
Was the day to replace the marker buoys on the estuary. |
 |
 |
each buoy held down with a tractor wheel and 10 meters of 16mm chain |
 |
 |
each hauled onto the RIB and positioned. Each one engineered perfectly.
Well done everybody |
|